it takes 20 people 24 days to build a barn. in how many days will the barn be built if they had 32 people working

Respuesta :

bluevortexwitepower bluevortexwitepower
  • 02-02-2019

Answer:

15 days

Step-by-step explanation:

Number of ppl it takes to build a barn in 24 days=20

Time it will take 32 people to build the barn=24*20/32=15 days

Answer Link

Otras preguntas

In the equation 3x 2 + 6x = 12, the value of c is:
Someone please help me with number 5. I really don't understand this.
Which type of muscle tissue is under voluntary control?
Kyle makes his own breakfast every Saturday. It usually takes ten minutes to make the breakfast and five minutes to eat the breakfast. Kyle tells mom that he h
Read the following passage taken from reports that Cortés wrote to Spanish King Charles V: This noble city contains many fine and magnificent houses; which may
How do european countries provide their citizens with more services than the u.s. government provides its citizens?
Determine the 5th term in geometric sequence whose first term is 4 and whose common ratio is 3
what is the positive solution of x^2-36=5x
which of the these terms refers to a place where water is available in the desert
The type of aquatic animals that can survive in particular water is determined by analyzing its pH temperature volume turbidity