Task level and project level charts are both prepared by the same person, usually the project manager. True False

Respuesta :

bratislava bratislava
  • 16-02-2020

Answer:

True

Explanation:

  • The project manager is accountable for the activities that result n the end results also maintain the progress. And the mutual interaction of the tasks of various parties and reduces the risk of the failure and maximizes the benefits and reduces the costs.
Answer Link

Otras preguntas

A gallon jug of milk is 3/4 full. After breakfast the jug is 1/12 full. Find the difference of the amounts before breakfast and after breakfast.
A cable is 40 decimeter a long. How long is the cable in meters.
What's 1,537x242 SHOW UR WORK PLEASE!!!
Solve each equation for the indicated variable T=an+b (solve for B)
Hot dogs come in packs of 10 while bonds: packs of eight what are the least number is a fax you should buy in order to have the same numbers of hot dogs and bun
Smell can travel a long way in the air.what does brine smell like? how do you know?
Five less than 3 times the length, l
2g - 3 = 35??? help !?
Acceleration can bea change in speed and.........?
Negative 1 minus 8 equals