Mixedemotions1150 Mixedemotions1150
  • 04-03-2020
  • Computers and Technology
contestada

A critical activity is________________.a. an activity that consumes no time but shows precedence between events. b. a milestone accomplishment within the project. c. an activity with zero slack. d/ the beginning of an event.

Respuesta :

Ritmeks
Ritmeks Ritmeks
  • 09-03-2020

Answer:

C

Explanation:

Critical activity is the sequential activities from beginning to the end of a project. A lot of projects have a single critical path, although some projects may have more than one critical activity which depends on the flow logic utilized in the project.

Answer Link

Otras preguntas

Which is true about the volume or surface area of these prisms? The surface area of A is greater than the surface area of B. The surface area of B is greater th
what is a possible effect of replacing batteries?
at which life-cycle stage are stars most stable?
Describe what happens when you take a antacid
Which function is an example of exponential decay? A.) y = 0.3(2)x B.) y = 4(8)x C.) y = 5(0.6)x D.) y = 1.4(3)x
What is the probability of meeting someone born in January or December (Assume there are 365days in a year)
Write these numbers​ from least to greatest 1 1/2, 1.05, 1.215, 1.058
A sock drawer has 8 blue socks and 6 black socks. a sock is chosen at random. then, without replacing that sock, another sock is chosen at random. what is the p
Why is Kentucky a good place to raise horses
If someone else will also be receiving a copy of a business letter, where will you find the reference to that person