A critical activity is________________.a. an activity that consumes no time but shows precedence between events. b. a milestone accomplishment within the project. c. an activity with zero slack. d/ the beginning of an event.

Respuesta :

Ritmeks
Ritmeks Ritmeks
  • 09-03-2020

Answer:

C

Explanation:

Critical activity is the sequential activities from beginning to the end of a project. A lot of projects have a single critical path, although some projects may have more than one critical activity which depends on the flow logic utilized in the project.

Answer Link

Otras preguntas

What percentage of the 27.3 million businesses in the united states are small companies with less than 500​ employees?
Holly would like to run an annual major disaster recovery test that is as thorough and realistic as possible. she also wants to ensure that there is no disrupti
what is the distance around a triangle that has sides measuring 21/8 feet, 31/2 feet and 21/2 feet?
Blood clotting and childbirth are examples of A. sensory input. B. negative feedback. C. positive feedback. D. hormonal control.
Which of the following is NOT an autosomal recessive disease? achondroplastic dwarfism polydactyly Huntington's disease all of the above
When do you think it is unfair or deceptive to try to use emotions to persuade people?
Question 3(Multiple Choice Worth 4 points) (02.01)Polygon LMNP slides 5 units right and 4 units down on the coordinate plane. If the original measure of angle
If you removed 25 cc of blood from a patient, how many mL did you remove?
Which best describes the first two years of the revolutionary war
what is vergils advice to dante as spoken at the gate of hell