jeevenjoji2007
jeevenjoji2007 jeevenjoji2007
  • 01-09-2020
  • Mathematics
contestada

if 12 people can finish a job by 5 days how many days will be required finish the same job by 10 people

Respuesta :

ishashunnny
ishashunnny ishashunnny
  • 01-09-2020

Answer:

4

Step-by-step explanation:

12p=5d

1p=5/12

10p=4.1666

≈4 days

Answer Link

Otras preguntas

Both glycoside and peptide linkages result from dehydration synthesis. A.TRUE B.FALSE
what is an important component of ATP that is needed to transfer and release energy directly?
210 is how many tens? an also what does 240 equals how many tens
Babylonian method to approximate square root of 19
Which of the following statements is true? Question 19 options: Carbohydrates contain more energy that lipids because their bonds release more energy when broke
what is the sum of 1/7 and 2/7
What is a cash flow statement
Two is subtracted from a number, and then the difference is divided by 3. The result is 30. Find the number. Explain how you found the answer thoroughly, taking
Preventative medicines that contain antibodies are called a. vaccines b. antitoxins c. pathogens d. antibiotics
How did Reconstruction help and hurt the north?