raazshah661 raazshah661
  • 03-09-2020
  • Mathematics
contestada

A can do a piece of work in 20 days and B can do it in 12 days,B work for 9 days,in how many days A alone can do the work​

Respuesta :

roseheart889 roseheart889
  • 03-09-2020

Answer: 9

Step-by-step explanation:

Answer Link

Otras preguntas

I need help!!!!!!!!!!!!!!!!!
Write a polynomial that fits the description: A fifth-degree polynomial with leading coefficient 4
What type of microscope are you most likely to see/find in a High School biology laboratory?
How is German economy doing during the Great Depression?
The sum of 5 consecutive integers is 270. What is the second number in this sequence?
A box can hold a maximum of 60 comic books. If comic books are bundled together in groups of 8, write and solve the inequality to find the maximum number of bun
800 is 10 times as much as ---------
When did liberalism and conservatism began?
Please Help Thank You
A machine produces 240 bolts in 25 minutes. At the same rate, how many bolts would be produced in 45 minutes?