For a process, the average range for all samples was 5 and the process average was 25. If the sample size was 10, calculate UCL for the R-chart.

Respuesta :

fichoh
fichoh fichoh
  • 07-06-2021

Answer:

8.885

Step-by-step explanation:

Given that :

Sample size, n = 10

The average range, Rbar for all samples = 5

The upper control limit, UCL for the R-chart is :

UCL L= D4Rbar

From the control chart constant table, D4 = 1.777

Hence,

UCL = 1.777 * 5

UCL = 8.885

The UCL for the R-chart is 8.885

Answer Link

Otras preguntas

What is the silk road? What valuable products were traded on the silk road?
What is the silk road? What valuable products were traded on the silk road?
What is the silk road? What valuable products were traded on the silk road?
What is the silk road? What valuable products were traded on the silk road?
What is the silk road? What valuable products were traded on the silk road?
What is the silk road? What valuable products were traded on the silk road?
What is the silk road? What valuable products were traded on the silk road?
What is the silk road? What valuable products were traded on the silk road?
What is the silk road? What valuable products were traded on the silk road?
What is the silk road? What valuable products were traded on the silk road?