if 10 man can work 6hours.How many more men are needed towork in 4 hours​

Respuesta :

mathstudent55
mathstudent55 mathstudent55
  • 03-12-2021

Answer:

5 more men

Step-by-step explanation:

10 men do a job in 6 hours.

To do the job in 2 hours, 1/3 of the time, you need 3 times as many men.

30 men do a job in 2 hours.

To do the job in twice the time, 4 hours, you need half the men.

15 men do a job in 4 hours.

15 men - 10 men = 5 men

You need 5 more men.

Answer Link

Otras preguntas

Would America's political process be better without political parties?
Más féidir leat é seo a léamh anseo tá pointí saor in aisce!
WHOEVER GOT TWO OR ALL OF THEM RIGHT I WILL GIVE U BRANLYES!!!! TRUE OR FALES: WAS SGT STUBBY WAS THE FIRST DOG TO GO TO WORLD WAR ONE. WHAT IS THE WORS WAR IN
I have 16 pencils. I have 4 more than 2 times the amount you have. How many pencils do you have?
On the 74ls74 d flip-flop, the pr (preset) and clr (clear) inputs have a circle. what do these symbols mean?
Select the correct answer from the drop-down menu. 8 3 For a certain base, blogi and slog, 0.5 = -1 The value of log, 46 Re
why could an ecosystem be unable to sustain an increase in carnivores? A. There is not enough prey B. The carnivores now have more space C. plants growth incre
What is 45% of 156? Thanks.
a 10.0 kg mass is at the origin. A 20.0 kg mass is 0.500 m to the left of it, and a 30.0 kg mass is 1.25 m to the right of it, what is the net gravitational for
3x 1/3 brainliest if answer