sefykady
sefykady sefykady
  • 16-01-2022
  • Mathematics
contestada

If 6 men finish a piece of work in 8 days, how long will it rake 4 men to​

Respuesta :

prasamsharayamajhi
prasamsharayamajhi prasamsharayamajhi
  • 16-01-2022

Answer:

6 men finish a piece of work in 8 days

1 men finish a piece of work in 8*6 days

4men will finish a piece of work in 48/4

days

..

which is equal to 12 days

Answer Link
aamtally
aamtally aamtally
  • 16-01-2022
6 men working 8days = 48man days
So if 4men were to do same work then=48/4 =12 days
So it takes 12 days
Answer Link

Otras preguntas

can you help me with this​
A 2.4L balloon filled with helium at room temperature 25oC is put into liquid nitrogen (-196oC). What will the new volume be?
find the value of x in the triangle shown below. 45° 56°
The angle bisectors of triangle XYZ meet at point P. What is the measure of angle PYK
!PLEASE HELP ASAP! How many grams of aluminum can be produced by decomposing 12.3 grams of aluminum oxide?
BRAINLIEST Click the links to open the resources below. These resources will help you complete the assignment. Once you have created your file(s) and are ready
A 2.70g vitamin C tablet is found to contain 0.0109 mol of ascorbic acid (C6H806}. The molar mass of C6H806 is 176.12 g/mol. What is the mass percent of C6H806
Graph the line that contains the point (-2,6) and has a slope of -1/3
why is urine called urine? why is the urinary system so important ?
heres another edit of my song (sad boi hours) what yall think